Hotline:400-880-1556

English




Mobile power KC certification test items——ZRLK

Author:中认联科 time:2020-11-24 Ctr:934

KC certification overview

In order to enable consumers to have a clearer understanding of the certification marks marked on the purchased products and to reduce the various certification costs borne by product manufacturers, the Korea Institute of Technology and Standards (KATS) announced on August 20, 2008 that it will The new certification system KC (Korea Certification) certification will be implemented on the 1st. The plan was first implemented in the Ministry of Knowledge Economy in July 2009, and was expanded to all departments at the end of 2010.

image.png

Mobile power KC certification implementation standard: KC62133

The following documents need to be submitted when applying for KC certification:

1. Application for certification;

2. Parts list;

3. Electrical wiring diagram;

4. Specification of safety components;

5. Product manual;

6. Authorization certificate of the agent

Factory inspection

1. The first factory inspection

After accepting the application for product certification, it is necessary to conduct the first factory inspection of the factory and conduct a preliminary assessment of the factory's quality control system.

(1) Product change control procedures (e.g., after the certified product change application is approved by the certification body, the corresponding technical documents shall be formulated in strict accordance with the approved change content and issued to the relevant departments to correctly implement the certified product change. Not approved For approved changes, certification marks cannot be applied to the changed products.);

(2) Document and data control procedures;

(3) Quality record control procedures (the retention period of the purchase, routine and operation inspection records is at least 3 years);

(4) Routine inspection and confirmation inspection procedures;

(5) Control procedures for unqualified products;

(6) Inspection or verification procedures for key components and materials;

(7) Internal quality audit procedures;

(8) Process work instructions, inspection standards, instrument and equipment operating procedures, management systems and other procedures. The factory should keep at least the above quality records to verify that the factory has indeed conducted all production inspections and production tests. The quality records should be true and effective ;

(9) Product routine inspection and confirmation inspection records; purchase inspection/verification records of key components and materials and qualification certificates provided by suppliers.

KC certification test items

1. High Temperature Storage

2. Temperature Cycling Test (Temperature Cycling Test)

3. External Short Circuit Test (External Short Circuit Test)

4. Crushing of Cells

5. Cell Protection Against a High Charging Rate (Cell Protection Against a High Charging Rate)

6. Overheating test (Thermal Abuse Test)

image.png

Please contact our company ZRLK for KC certification test of mobile power supply. We can provide you with professional and efficient testing and certification services with favorable prices and good service. If you have other electronic products that need to apply for KC certification, please provide us with product pictures and specifications. We will provide the corresponding cycle, quotation and specific plan according to your product. Welcome to inquire!


Related Articles
  • Lithium batteries and products with batteries Customs clearance guide: Required certification and safety requirements

  • Do you dare to use square batteries without 3C certification?

  • [Important reminder] The Canadian IC ID registration fee may rise again

  • Attention! ANATEL of Brazil updated the certification requirements for "Wi-Fi 7 devices"

Follow Us