Hotline:400-880-1556

English




[Change Notice] Notice on the change of the

Author:中认联科 time:2020-06-24 Ctr:1219

Notice on the change of the "Safety Certification Rules for Transformers for Switching Mode Power Supplies" and the implementation of the new standard GB/T19212.17-2019

Relevant certification companies:

GB/T19212.17-2019 "Safety of transformers, reactors, power supply units and similar products with a power supply voltage of 1100V and below. Part 17: Special requirements and tests for switching power supply units and transformers for switching power supply units" in 2020 Implemented on May 1, 2014, this standard replaces GB19212.17-2013. GB/T19212.17-2019 implements GB/T19212.1-2016 "Safety of transformers, reactors, power supply units and their combinations Part 1: General requirements and tests" corresponding to the general standard. The following are all referred to as "new standards". The China Quality Certification Center revised the “Safety Certification Rules for Transformers for Switching Mode Power Supplies” according to the above-mentioned standard version changes. The newly issued certification rule number is CQC11-461214-2020, which replaces CQC11-461214-2015. Hereinafter referred to as the "new version of the rules".

The matters related to the implementation of the certification business are now notified as follows:

1. From the date of announcement, the switching power supply transformer shall be tested and certified in accordance with the new version of the standards and rules. 2. For products that have obtained the old version of the standard and rules certification, the certificate holder can submit a change application to our center and accept the test for the new and old standard difference test items (see the appendix for specific test items), and the test is qualified The new version of the standard and rules certification will be issued later. The certificate conversion work should be completed by April 30, 2021. Certificates that have not completed the conversion after the deadline will be suspended for 3 months. If it is not completed beyond the suspension deadline, the certificate will be revoked. 3. The follow-up inspection after certification is carried out according to the standards and rules listed in the valid certificate.

annex:

19212.1 New and old standard differences and supplementary tests.doc

19212.17 Difference between new and old standards and supplementary test.doc

Please click "https://www.cqc.com.cn/www/chinese/c/2020-05-26/556365.shtml" below to download the attachment

China Quality Certification Center


Related Articles
  • CCC certification points of large capacity charging box: battery, headphones can not be less

  • CCC certification of the earphone charging case: The rated capacity of the battery cell is less than 600mAh.

  • Attention! The latest standard of EU toy safety standard EN 71-3 has been released

  • Information Express | The European Union has issued a draft regulation on energy efficiency of external power adapters, which will be implemented in 2025

Follow Us