Hotline:400-880-1556

English




Mobile power KC certification implementation standards

Author:中认联科 time:2020-07-20 Ctr:1575

Mobile power KC certification implementation standard: KC62133

 image.png

Test items:

1. High Temperature Storage

2. Temperature Cycling Test (Temperature Cycling Test)

3. External Short Circuit Test (External Short Circuit Test)

4. Crushing of Cells

5. Cell Protection Against a High Charging Rate (Cell Protection Against a High Charging Rate)

6. Overheating test (Thermal Abuse Test)

The following documents need to be submitted when applying for KC certification:

A. Certification application;

B. Parts list;

C. Electrical wiring diagram;

D. Specification of safety components;

E. Product Manual;

G. Authorization document of the agent

Factory inspection

1. The first factory inspection

After accepting the product certification application, it is necessary to conduct the first factory inspection of the factory and conduct a preliminary evaluation of the factory's quality control system.

(1) Product change control procedures (e.g., after the certified product change application is approved by the certification body, the corresponding technical documents shall be formulated in strict accordance with the approved change content and issued to the relevant departments to correctly implement the certified product change. Not approved For approved changes, certification marks cannot be applied to the changed products.);

(2) Document and data control procedures;

(3) Quality record control procedures (the retention period of the purchase, routine and operation inspection records is at least 3 years);

(4) Routine inspection and confirmation inspection procedures;

(5) Control procedures for unqualified products;

(6) Inspection or verification procedures for key components and materials;

(7) Internal quality audit procedures;

(8) Process work instructions, inspection standards, instrument and equipment operating procedures, management systems and other procedures. The factory should keep at least the above quality records to verify that the factory has indeed carried out all production inspections and production tests. The quality records should be true and effective

(9) Product routine inspection and confirmation inspection records; purchase inspection/verification records of key components and materials and qualification certificates provided by suppliers.

If you need the above testing and certification, you can call our company ZRLK to inquire about the specific cost and cycle. There are professional engineers here to provide a full range of technical services such as testing, certification, appraisal, technical consultation, and solutions for corporate customers. ZRLK has focused on testing and certification of batteries and peripheral consumer products for 15 years, always paying attention to changes in national regulations, and providing customers with one-stop certification services in multiple countries and regions to ensure that your products quickly enter the target market.

image.png


Related Articles
  • Do you dare to use square batteries without 3C certification?

  • [Important reminder] The Canadian IC ID registration fee may rise again

  • Attention! ANATEL of Brazil updated the certification requirements for "Wi-Fi 7 devices"

  • Csa helps charge bank 3C certification to ensure safety and compliance

Follow Us